• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Condition: New
  • Place of Origin: Henan, China (Mainland)
  • Brand Name: Bizoe
  • Model Number: all
  • Production Capacity: 5-20T
  • Voltage: 380V
  • Power(W): 200kw
  • Weight: 15T
  • Dimension(L*W*H): all
  • Certification: CE
  • Warranty: 1 years
  • After-sales Service Provided: Engineers available to service machinery overseas
  • Name: responsible install cassava flour processing equipment for hot sale
  • Material: stainless steel
  • Warrarhty: 1 year
  • Discount: negotation
  • Useful life: 10 years
  • Operation: Full Automatic
  • Quality: high quality
  • Place of origin: henan china
  • Type: food processing
  • Capacity: 1-24t/day

Packaging & Delivery

Packaging Details responsbile install cassava flour processing equipment for hot sale should be packed with wooden case, container or as you request.
Delivery Time within 45 days after received your deposite

Responsible Install Cassava Flour Processing Equipment for Hot Sale

Product Description

 

Details of Bizoe cassava flour processing equipment:

 

1Cassava convey, washing and peeling section

The fresh cassava roots transported by the conveyor into the feeder of the cleaning machine, then cleaning and peeling  machine will remove the dirt and other foreign matters completely, and then the cleaning cassava in a temporary storage hopper into the next procedurethe grinding and rasping sectionautomatically.

2Cassava rasping&grinding section( Curved Mesh Crusher)

The grinding is the most important part of cassava starch extraction. Bizoe adoptCurved Mesh Crusher( national patent machine)with high efficiency allows the starch granules in the cassava cells to be released out completely.The machine adoptproduction works of multi-crushing, multi-washing, multi-filter, multiextrusionwhich ensures minimum quantity of the remaining starch in the cassava residue and separating the starch from the cassava slurry and the cassava residue.

 

 

3. Starch dewatering section( Vacuum Dehydrator and Overflow Air Flash Drying System) 

The starch out of the cyclone station has 45% moisture so it must be dewatered and dried. The starchslurry enters vacuum dewatering filter tank from the starch milk buffer tank. Under the vacuum formed by the vacuum pump, the starch slurry is sucked to the drum surface, then filtrate goes through filter mesh and enters the filtrate separating tank. The starch cake remains on mesh surface and is scraped off by a scraper and transported by the conveyor belt into the air dryer. Then weighing and packing.

 

Flow chat of cassava flour processing equipment:

c

 

 

 

 

Packaging & Shipping

Responsible Install Cassava Flour Processing Equipment for Hot Sale

 

Packaging: small and regualr machine shall be packed with wooden case, then container; large and irregular machines shall be nake packed, then container.

Delivery terms: within 45 days after received your deposite(for whole production line), within 15days after received your deposite(for single machine)

Main Ports: Tianjin, Shanghai, Qingdao, Ningbo, Weihai, Shenzhen or as you request.

 

Our customers

 

Our Services

As a professional exporter,our target is to serve worldwide clients with high-quality products,great reliability,devoted responsibility,professional services and honorable credibility to meet customers' requirements in all aspects. We will supply you 24 hours a day and 7 days a week after-sale services.

Our Service of cassava flour processing equipment:

 

1) Our salers will give a detailed introduction and explanation to the whole line.

2) Our engineer will design the factory layout for you.

3) We can offer you the OEM, basis on your request.

4) We can offer the Turkey Project for your request.

5) We offer you the whole factory design and machines' installation drawing.

6) You can sell our worker to our factory for learning before the goods shipping. 

7) We offer machine operation trainning for free when machine being installed.

8) One year warranty. 

 

Warranty: 1 year

Delivery Time: within 45 days after received your deposite( for production line); within 15 days after received your deposite( for sinagle machine)

Payment terms: T/T, L/C, D/A, D/P or as you request.

Installation: professinal engineers are available to install machines in your country.

 

Company information

Zhengzhou Bizoe Importing & Exporting Com., Ltd.

 

Other machines in our factory:

 

Contact information

May i invite you to visit our factory, i believe you will be satisfeied with our machine

 

 

 

 

 

 

 

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
Trade Assurance
China (Mainland) | Trading Company
Transaction Level:
Supplier Assessments:
2 Transactions 40,000+
The supplier’s transactions conduted via Alibaba.com in the past 6 months.
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $43,000
Learn More